Explain three basic physical requirements of siting a Hydro Electricity project.

1 Answer

0 votes
by
  1. a large volume of water sufficient and constant to enable continuous production of electricity
  2. sleep gradient to provide a high head to turn the turbines
  3. a firm rock base to provide a strong foundation to support the dam
  4. a deep gorge to provide a large space for a reservoir
  5. presence of a narrow gorge behind the dam which minimizes the cost of construction of the dam
  6. presence of impervious rocks to prevent water see page